Bespoke industrial pellet plant engineered to your exact requirements
Power
Custom — based on capacity
Floor Area
Custom — based on layout
Equipment
10 units
45–90 days
Commissioning time
8–15 persons
Operators needed
5–20 TPH
Capacity range
2 years
Equipment warranty

Custom industrial plant — configured to your capacity and site

Large-format ring die mill — selected per feedstock and throughput

High-speed packing line integrated with the production system
Overview
The Custom Pellet Plant is designed for industrial producers who require capacity, layout, or process configurations beyond our standard packages. We engineer the plant around your raw material, site constraints, daily production targets, and pellet quality specifications.
Custom plants range from 5 TPH to 20 TPH and above. Every component — from hammer mill sizing to dryer capacity, ring die selection, and packing line speed — is specified based on your feedstock analysis and operational requirements.
The supply package includes a complete civil layout plan, electrical single-line diagram, process flow documentation, and dedicated on-site commissioning support. Our engineering team stays engaged from specification through trial production.
Best suited for
Specifications
How it works
Needs Assessment
We start with your raw material specs, daily output target, site area, and utility availability to define the plant configuration.
Engineering & Layout
Our team prepares a detailed equipment list, civil layout plan, and process flow diagram tailored to your site.
Equipment Supply
All machinery is sourced, inspected, and dispatched with full documentation. Lead times are confirmed at order stage.
Installation & Commissioning
Our technical team manages on-site installation, trial runs, and initial production batches to ensure the plant hits target output.
Handover & Support
Operator training is conducted on-site. Post-commissioning support is available for process optimisation and troubleshooting.
What's included
Common questions
Custom plants are engineered from 5 TPH up to 20 TPH and beyond. Capacity is determined by your daily output target, available raw material volume, and site constraints. We size every major component against your specific feedstock.
We begin with a needs assessment covering your raw material specification, moisture profile, output target, site area, and utility availability. From this we prepare an equipment list, civil layout, and process flow diagram before any order is placed.
Yes. Feedstock analysis is the first step. Hammer mill screen sizing, dryer capacity, die specification, and conditioning are all selected based on the density, fibre structure, silica content, and moisture behaviour of your specific material.
Equipment manufacturing and supply typically takes 60–90 days from order confirmation. Installation and commissioning adds a further 45–90 days depending on capacity and site readiness. Exact timelines are confirmed at order stage.
Yes. The supply package includes a complete civil layout plan with foundation details, electrical single-line diagram, cable schedule, and process flow documentation. Our engineering team coordinates with your civil contractor throughout.
We respond within 48 working hours